The Donggou reclaimed water station of the square started construction in August 2008 and was completed and put into operation in September 2009, covering an area of about 3800 M2 with a total investment of 41.3 million yuan.
Located in the west of Shungeng Road, Jinan City, east of Shandong Huitang and north of Shungeng substation, Guangchang Donggou reclaimed water station belongs to Daming Lake sewage system in Daming Lake area. The treated sewage is taken from Shungeng Road sewage main pipe, with a treatment capacity of 10000 tons / day. The treatment process is hydrolysis acidification + two-stage biofilter process. The treated reclaimed water replenishes the water source of Guangchang Donggou.
Shandong Ouka Environmental Protection Engineering Co., Ltd